Anson Engine Museum
Anson Engine Museum Gallery
Home
Login
Anson Engine Museum
Album list
Last uploads
Last comments
Most viewed
Top rated
My Favorites
Search
Image search results - "anson museum building"
Preparing the foundations
1821 views
View between the main hall and the new Memorial Building
2724 views
Foundations being laid
1559 views
Almost finished
1555 views
Most of the brickwork is complete before doors and glass can be fitted
All ready to dig out the foundations
1519 views
The concrete for the floor had to be laid in sections
1565 views
The foundations being dug out
1539 views
Another section of concrete goes down
1561 views
Foundations for the back work being prepared
1515 views
The engine over the Stott steam engine can be seen in the background
Another delivery of concrete for the floors arrives
1582 views
Trees down the drive need to be taken down to widen the area
1941 views
Work on widening the drive and entrance area before new surface laid
1650 views
76 files on 7 page(s)
1
2
3
4
5
6
7