Next stage of the dismantling process4709 viewsTaken at the college w/c 2 Oct 2006.
Photograph courtesy of Maurice Clyde
Second lot of parts arrive at museum4248 viewsThese arrived at museum 11 October 2006
Second lot of parts arrive at museum5834 viewsThese arrived at museum 11 October 2006
Second lot of parts arrive at museum4131 viewsThese arrived at museum 11 October 2006
Second lot of parts arrive at museum6456 viewsThese arrived at museum 11 October 2006
Second lot of parts arrive at museum4662 viewsThese arrived at museum 11 October 2006
Second lot of parts arrive at museum3973 viewsThese arrived at museum 11 October 2006
Next stage of the dismantling process4469 viewsTaken at the college w/c 2 Oct 2006.
Photograph courtesy of Maurice Clyde
Engineers at college5972 viewsThe engineers at the college when the engine was installed in Oct 1967.
Photograph courtesy of Maurice Clyde
Crank being fitted5785 viewsWhen the engine was installed at the Marine College in Oct 1967, crank being fitted.
Photograph courtesy of MauriceClyde
First load of Doxford engine parts arrive at museum4658 viewsPhotograph taken by Geoff Challinor of first load of parts arriving 3 October 2006. Load consists of the top section of the scavenge pump, top piston and cross head assembly and various smaller parts.
The next load arrives on a glorious sunny day4257 viewsCrank shaft and water brake - each weighing 17 tons